HomeMast ClimberScaffoldingProjectsServices
Request a Quote
Union Residential Tower high-rise project in West Bay, Doha, Qatar

Union Residential Tower

West Bay, Doha, Qatar
2017
Urbacon Trading & Contracting
Request a Quote

Project Overview

Union Residential Tower is a high-rise residential project located in West Bay, Doha.

The project consists of two basement levels, ground floor, mezzanine, and 35 residential floors.

The facade was clad using large ceramic panels measuring 3.6m x 1.2m with 5mm thickness.

NABK Co developed the fixation system in collaboration with Sika Qatar using the NABK-FS02 system.

Factory assembly of sub-frames was followed by installation into the vertical profile system fixed on the facade.

An invisible fixation system was applied, resulting in a clean aesthetic finish.

The system provided excellent structural stability despite the slim 5mm panel thickness.


Project Information

Client: Union Residential Tower

Contractor: Urbacon Trading & Contracting

Category: High-Rise Residential Tower

Project Size: 2 Basements + Ground + Mezzanine + 35 Floors

Completion: October 2017

Scope of Work

Ceramic facade cladding supply, fabrication, and mechanical fixation system installation.

Project Gallery

Mast climber installation at Union Residential Tower in West Bay, Doha, Qatar
Mast climber installation at Union Residential Tower in West Bay, Doha, Qatar
Mast climber installation at Union Residential Tower in West Bay, Doha, Qatar
Mast climber installation at Union Residential Tower in West Bay, Doha, Qatar
Mast climber installation at Union Residential Tower in West Bay, Doha, Qatar
Mast climber installation at Union Residential Tower in West Bay, Doha, Qatar
Mast climber installation at Union Residential Tower in West Bay, Doha, Qatar
We respond within 24 hours
Free site assessment • Fast response