High-Rise Residential Tower

Union Residential Tower

West Bay, Doha, Qatar2017Urbacon Trading & Contracting
Request a Quote
Overview

Project Overview

Union Residential Tower is a high-rise residential project located in West Bay, Doha.

The project consists of two basement levels, ground floor, mezzanine, and 35 residential floors.

The facade was clad using large ceramic panels measuring 3.6m x 1.2m with 5mm thickness.

NABK Co developed the fixation system in collaboration with Sika Qatar using the NABK-FS02 system.

Factory assembly of sub-frames was followed by installation into the vertical profile system fixed on the facade.

An invisible fixation system was applied, resulting in a clean aesthetic finish.

The system provided excellent structural stability despite the slim 5mm panel thickness.

Project Info

ClientUnion Residential Tower
ContractorUrbacon Trading & Contracting
CategoryHigh-Rise Residential Tower
Project Size2 Basements + Ground + Mezzanine + 35 Floors
CompletionOctober 2017
DurationApproximately 16 months

Scope of Work

Ceramic facade cladding supply, fabrication, and mechanical fixation system installation.

Equipment

Equipment Used

SAEclimber P36

SAEclimber
TypeTwin Mast Climbing Work Platform
Max Height150m
Load CapacityUp to 3,600 kg (twin mast)
StandardEN 1495 CE / ISO 9001
Challenges

Challenges & Solutions

1

Ultra-Thin Panel Structural Risk

NABK developed the NABK-FS02 invisible fixation system in collaboration with Sika Qatar to safely secure 5mm ceramic panels without visible fasteners or structural compromise.

2

Large Panel Size Handling

Factory pre-assembly of sub-frames was used to ensure precise alignment before site installation, reducing on-site handling risks for the oversized 3.6m x 1.2m panels.

3

Clean Aesthetic Requirement

An invisible fixation system was engineered to deliver a seamless facade finish while maintaining full structural integrity across all 35 floors.

Project Outcome

NABK delivered a flawless invisible facade system across all 35 floors, with the NABK-FS02 fixation solution providing full structural integrity and a clean seamless finish that met the client's strict aesthetic requirements.

Gallery

Project Gallery

Mast climber installation at Union Residential Tower
Mast climber installation at Union Residential Tower
Mast climber installation at Union Residential Tower
Mast climber installation at Union Residential Tower
Mast climber installation at Union Residential Tower
Mast climber installation at Union Residential Tower
Mast climber installation at Union Residential Tower

Start Your Project With Us Today

We provide mast climber and scaffolding solutions across Qatar with free site inspection.

  • ✔ 50+ High-Rise Projects Completed in Qatar
  • ✔ Response within 24 hours

Phone

00 974 7049 1460

We respond within 24 hours

Free site assessment • Fast response